450 Hectares - PHASE 1

INFRASTRUCTURE & UTILITIES

Multi-Level Toll Access

Multi-Level Toll Access

Lorem Ipsum

Lorem Ipsum

Internet Connection

ICT SPECIFICATION

Internet Speed 20 - 100 Mbps

Services

Telephone
Internet

CCTV

Connection type fiber optics

*the internet speed is possible to upgrade

Water Treatment Plant

CLEAN WATER TREATMENT PLANT

Clean Water

Supply 1.357L/s

Chloride 250mg/L

Calcium 500mg/L

Waste Water Treatment

WASTE WATER & WASTE TREATMENT PLANT

Supply Capacity 1.045 L/s (cluster 1)

Transport Capacity 3.700 m3/day (cluster 1)

Natural Gas by PT PGN

NATURAL GAS BY PT PGN

Supply up to 15 MMSCFD (until 2024)

Pressure 350 - 500 psig

Gross Heating Value 950 - 1100 Btu/SCF

Electricity By PT PLN

WASTE WATER & WASTE TREATMENT PLANT

Supply Capacity 1.045 L/s (cluster 1)

Transport Capacity 3.700 m3/day (cluster 1)

INDUSTRIAL LOT PHASE 2 STAGE 1

  • SPECIFICATION

    Area Size

    reCAPTCHA v3 is intended for power users, site owners that want more data about their traffic, and for use cases in which it is not appropriate to show a challenge to the user.

  • SPECIFICATION

    Area Size

    reCAPTCHA v3 is intended for power users, site owners that want more data about their traffic, and for use cases in which it is not appropriate to show a challenge to the user.

  • SPECIFICATION

    Area Size

    reCAPTCHA v3 is intended for power users, site owners that want more data about their traffic, and for use cases in which it is not appropriate to show a challenge to the user.

INDUSTRY POSTS