450 Hectares - PHASE 1

INFRASTRUCTURE & UTILITIES

Multi-Level Toll Access

Multi-Level Toll Access

Lorem Ipsum

Lorem Ipsum

Internet Connection

ICT SPECIFICATION

Internet Speed 20 - 100 Mbps

Services

Telephone
Internet

CCTV

Connection type fiber optics

*the internet speed is possible to upgrade

Water Treatment Plant

CLEAN WATER TREATMENT PLANT

Clean Water

Supply 1.357L/s

Chloride 250mg/L

Calcium 500mg/L

Waste Water Treatment

WASTE WATER & WASTE TREATMENT PLANT

Supply Capacity 1.045 L/s (cluster 1)

Transport Capacity 3.700 m3/day (cluster 1)

Natural Gas by PT PGN

NATURAL GAS BY PT PGN

Supply up to 15 MMSCFD (until 2024)

Pressure 350 - 500 psig

Gross Heating Value 950 - 1100 Btu/SCF

Electricity By PT PLN

WASTE WATER & WASTE TREATMENT PLANT

Supply Capacity 1.045 L/s (cluster 1)

Transport Capacity 3.700 m3/day (cluster 1)

OUR TENANTS

COUNTRY

South Korea


LINE OF BUSINESS

Glass Industry


LOT

II-6, II-7, II-5, II-8


KCC GLASS CORPORATION

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

COUNTRY

South Korea


LINE OF BUSINESS

Glass Industry


LOT

II-6, II-7, II-5, II-8


KCC GLASS CORPORATION

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

1
2

CORPORATE ACTIONS