



450 Hectares - PHASE 1
INFRASTRUCTURE & UTILITIES
Multi-Level Toll Access
Multi-Level Toll Access
Lorem Ipsum
Lorem Ipsum

Internet Connection
ICT SPECIFICATION
Internet Speed 20 - 100 Mbps
Services
Telephone
Internet
CCTV
Connection type fiber optics
*the internet speed is possible to upgrade

Water Treatment Plant
CLEAN WATER TREATMENT PLANT
Clean Water
Supply 1.357L/s
Chloride 250mg/L
Calcium 500mg/L

Waste Water Treatment
WASTE WATER & WASTE TREATMENT PLANT
Supply Capacity 1.045 L/s (cluster 1)
Transport Capacity 3.700 m3/day (cluster 1)

Natural Gas by PT PGN
NATURAL GAS BY PT PGN
Supply up to 15 MMSCFD (until 2024)
Pressure 350 - 500 psig
Gross Heating Value 950 - 1100 Btu/SCF

Electricity By PT PLN
WASTE WATER & WASTE TREATMENT PLANT
Supply Capacity 1.045 L/s (cluster 1)
Transport Capacity 3.700 m3/day (cluster 1)

OUR TENANTS
COUNTRY
South Korea
LINE OF BUSINESS
Glass Industry
LOT
II-6, II-7, II-5, II-8
KCC GLASS CORPORATION
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna
aliqua.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna
aliqua.
COUNTRY
South Korea
LINE OF BUSINESS
Glass Industry
LOT
II-6, II-7, II-5, II-8
KCC GLASS CORPORATION
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna
aliqua.
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna
aliqua.